Free CSM Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The CSM exam has 150 questions and runs 3 hours 30 minutes.

These 10 free CSM questions are organized by exam domain, so you can see how each part of the Certified Stormwater Manager blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Program Management

Question 1

A city trained grading contractors to improve erosion-control installation. Three months later, which finding provides the most direct evidence that field practice has improved?

Show answer & explanation

Correct answer: A - Comparable site inspections found fewer installation defects under unchanged inspection criteria.

Question 2

A proposed road embankment lies inside an adopted regulatory floodway. The accepted hydraulic analysis predicts a 0.18-ft increase in base-flood elevation. No conditional map or floodway revision has been approved. Under the National Flood Insurance Program's minimum requirements, which permit decision is supported?

Show answer & explanation

Correct answer: D - Require a no-rise redesign or prior FEMA approval of a conditional map and floodway revision.

Question 3

A creek is hydraulically connected to a shallow aquifer. The creek's water surface remains at elevation 100.0 ft, and its bed is at 97.0 ft. After municipal pumping increases, adjacent groundwater head falls from 101.2 ft to 98.6 ft. All elevations use the same datum. These measurements indicate that the reach:

Show answer & explanation

Correct answer: A - Changes from receiving groundwater to losing water to the aquifer.

Question 4

A watershed plan requires at least 150 kg of phosphorus removal annually. Four mutually exclusive treatment packages meet all other site and permit requirements. Their annualized costs include capital, operation, and maintenance. The city's selection criterion is the lowest annualized cost per kilogram among packages meeting the removal target. Which package wins that comparison?

Show answer & explanation

Correct answer: B - Package B: $54,000 per year; 180 kg removed per year

Domain 2: Water Quality and Quantity

Question 5

After four dry days, a storm outfall still carries cloudy flow with elevated ammonia and surfactants. Tracing finds the flow entering from a warehouse lateral; the storm pipe immediately upstream is dry. The warehouse has sanitary plumbing and foundation drainage, and access is authorized. Which test most directly checks whether the warehouse's sanitary plumbing contributes to this flow?

Show answer & explanation

Correct answer: C - Dye-test the warehouse's sanitary fixtures while observing the lateral at the storm manhole.

Question 6

A stormwater filter must remove at least 55% of incoming total suspended solids by event mass. Complete monitoring records 1,000 m³ entering at 100 mg/L, 800 m³ leaving through the filter at 40 mg/L, and 200 m³ bypassing untreated at 100 mg/L. Concentrations are flow-weighted event means. Using mass (kg) = concentration (mg/L) × volume (m³) / 1,000, how does the whole-system result compare with the requirement?

Show answer & explanation

Correct answer: D - 48% removal; the requirement is not met.

Question 7

At a former industrial parcel, the remediation plan prohibits runoff from entering contaminated native soil. A parking-lot retrofit must remove suspended solids and associated metals within a landscaped strip. Adequate hydraulic head and an approved storm-drain connection are available. Which design fits the site's treatment and groundwater-protection requirements?

Show answer & explanation

Correct answer: C - Bioretention with an impermeable liner and a bottom underdrain

Question 8

A builder plans to disturb a 0.6-acre lot in a subdivision whose common development plan will ultimately disturb 2.4 acres. Separate owners are developing the lots in phases. Runoff will discharge to waters subject to NPDES permitting, and no waiver applies. The builder already holds a local grading permit. Which acreage determines whether federal construction-stormwater coverage is triggered?

Show answer & explanation

Correct answer: B - The 2.4-acre disturbance under the common development plan

Question 9

A well-oxygenated stormwater biofilter reduces ammonium-nitrogen load while increasing nitrate-nitrogen load, with little change in total nitrogen load. The dominant transformation is:

Show answer & explanation

Correct answer: D - Nitrification

Domain 3: Operations and Maintenance

Question 10

A storm-sewer camera survey shows an intact crown and sidewalls, but sediment conceals the invert along much of the pipe. Flow is passing, and no ground settlement has been reported. To complete the pipe's structural condition assessment, the next work order should specify:

Show answer & explanation

Correct answer: B - Remove the deposits with compatible cleaning, then repeat the camera inspection.